Sunday, January 26, 2020

Deconstruction And Methods Of Demolition Construction Essay

Deconstruction And Methods Of Demolition Construction Essay There are many advantages of deconstruction over standard demolition. These advantages include (1) conservation of landfill space; (2) makes recycling easier; (3) potential building materials available for reuse; (4) preserves natural resources that would otherwise have to be used. In order to minimise the amount of natural resources being used and the energy involved in manufacturing these materials, a cautious approach to the disposal of CD waste needs to considered. Reusing materials prevents the use of embodied energy. This is the energy that goes into the production and manufacturing of a new product. Reducing the amount of energy required in manufacturing, producing and transporting new products leads to a reduction in damage to the environment. The figure below shows a system which could be implemented in order to limit the number of materials being disposed of on construction sites. Waste Management Hierarchy for construction and demolition operations Challenges facing deconstruction There are a number of challenges which face deconstruction including (1) tools needed for deconstruction do not always exist; (2) disposal costs of CD waste is relatively low; (3) deconstruction takes up more time than conventional demolition; (4) building and design codes do not always cover the reuse of building materials; (5) buildings are not designed to be dismantled; (6) the environmental and economic advantages of deconstruction are not recognized. Deconstruction around the world Australia Volume of waste produced The total volume of waste produced in Australia almost doubled between 1997 and 2007. In 1997, the total volume of waste produced in Australia stood at 22.7 million tonnes while in 2007, the total volume of waste shot up to 43.8 million tonnes. While 29% of the total waste produced was directly from household waste, the CD sector accounted for almost 40%. (ABS, 2010) Demolition Procedure The Netherlands Waste Tax Waste taxes are placed on waste brought to the landfill or to the incinerator. The rate of tax can vary depending on the type of waste. In 1995, the Netherlands imposed a tax on the disposal of waste. The reason for this tax was to make other forms of waste treatment more appealing. Since the introduction of the tax the total volume of waste sent to landfills has decreased by a significant amount. The figure below shows how the huge decline in waste sent to landfills since the tax was imposed in 1995. (Oosterhuis et al, 2009) This landfill tax is always on the increase in the Netherlands. In 2009, the landfill tax was à ¢Ãƒ ¢Ã¢â€š ¬Ã… ¡Ã‚ ¬90 per toone. This is one of the highest landfill tax rates in the European Union. (defra.gov.uk, 2010) Waste production and treatment in the Netherlands Landfill Waste Ban Along with imposing waste taxes, the Netherlands also implemented bans on sending recyclable and combustible waste to the landfill. This came into operation in 1997. This included separated CD waste. The reason for this ban was to limit the amount of waste going to landfills which is seen as the least favoured method of disposal. The responsibility for implementing the ban lies with the landfill operators who are inspected regularly by the governmentà ¢Ãƒ ¢Ã¢â‚¬Å¡Ã‚ ¬Ãƒ ¢Ã¢â‚¬Å¾Ã‚ ¢s waste management agency, SenterNovern. The introduction of the ban in the Netherlands proved to be a success in cutting down the amount of CD waste sent to landfill. In 2009, 97% of CD waste in the Netherlands is recovered. (defra.gov.uk) Deconstruction Procedure Step 1 The first step in dismantling a building is to check to see if the building contains any hazardous substances. One of the main hazardous wastes which cause concern in Ireland is asbestos. This is a natural mineral which is used in many buildings for fire proofing or thermal insulation. The danger with asbestos is that if it breaks up, the fibres which make up asbestos may then be inhaled into the lungs as dust. This increases the risk of lung cancer and causes lung tissue scarring. Under EU legislation it is no longer allowable to re-use asbestos or to even buy products containing asbestos in Ireland. This means that asbestos cannot be recycled; it must be disposed of after it has been removed from the building. (citizensinformation.ie) Step 2 After a specialist contractor strips the building of all hazardous materials it is time to investigate the building and salvage any objects that can be reused as they are. This may include marble fireplaces, timber floors, radiators, doors, sinks and central heating boilers. Step 3 The building is categorised under one of the following three headings: Brickwork or block work buildings with timber floors and timber roof structure with roof tiles. Concrete frame buildings with prestressed concrete components. Steel frame buildings. Step 4: For all three categories above, the next step is to remove the flooring, tiles, plaster from the walls and ceiling. Windows are removed along with services installations (e.g. wall plugs, light switches). Metals are then removed and piping is also removed before the proper demoltion of the building starts. Step 5: There are a number of different types of waste that arise from stripping the building. These should be then split up into burnable and non-burnable materials. The burnable components brought to be incinerated while the non-burnables brought to the landfill. Step 6: Demolition: Brickwork or block work buildings with timber floors and timber roof structure with roof tiles. When every component of the building has been removed with the exception of the masonry works and the floors it is time to start taking the building apart floor by floor. Floor joists and timber floors are removed using a crane. These timber joists and flooring can then be reused. The advantage to using these second hand joists and flooring is that they are fully seasoned meaning they will not shrink. After the timber has been removed, the masonry blockwork is cut into sections and transported to be crushed. It may also be the case that the blockwork may be needed by the owner of the building in a new construction project. In this case the blocks are pulled down one by one and the mortar removed. Concrete frame buildings with prestressed concrete components. Prestressed concrete components in a building cause problems when it comes to disassembly because most of the time it is not known that the elements are actually prestressed. If prestessed concrete is cut up it may cause a structural element in the buiding to collapse. Steel frame buildings. The beams are dismantled one by one working from the top down. If the steel beams cannot be reused then they are cut and to be melted and remouilded. From time to time, steel structures like bridges are only partially taken apart and shipped overseas where the exact bridge is reused in another location. Step 7: The foundations of the building are th final step in the deconstruction of a building. Like the other elements of the structure the foundation is separated, broken up and transported to the crusher. In the case of concrete piles, they are removed by vibrating and pulling. If it is the case that wooden piles have been used as the foundation then it may be more difficult to remove as it will tend to break into pieves when being pulled from the ground. Demolition Techniques Balling This is the demolition technique where a heavy cast iron or steel ball is used to knock a building. The ball usually weighs between 500 to 5000kg. The balling technique can be used to demolish concrete, reinforced conrete and masonry. It has become less popular due to the level of disturbance which arises on site including vibrations, noise and dust.The ball can come into contact with the building in two ways (1) free fall (2) swinging. In the free fall process the demolition ball is lifted up into the air by a large magnet and then it is dropped onto the building which is to be demolished. In the swinging process the demolition ball is attached to a steel line which is attached to a machine with a rotating frame. Demolition Ball at work Demolition Breakers There are two types of breakers used in demolition (1) pneumatic (2) hydraulic. The difference between the two is pneumatic breakers are run using compressed air while hydraulic breakers use compressed oil. These type of breakers are used on concrete, brickwork and stone. Both types of breakers are mainly associated with minor demolition works, however they can also be attached to excavators for major demolition works. Pneumatic Breaker Hydraulic Shears Hydraulic shears are attached to excavators. They can be used in the demolition of any size structures and a wide range of materials like steel, concrete and timber. The two shears have toothed shears which slide past eachother to break up the selected material. Hydraulic Shears cutting steel Thermal Cutting Thermal cutting is used to cut steel and iron. Cutting torches are used for this process. There are three types of cutting torches (1) fuel/oxygen (2) powder (3) plasma. The fuel/oxygen cutting torches are run on a combination of oxegen and fuels such as natural gas, propane and acetylene which cuts at a maximum temperature of 3200 degrees Celsius. The choice of the fuel depends on the thickness of the metal. If the metal is too thick for a regular cutting torch then a powder cutting torch can be used. These can reach a maximum temperature of 4500 degrees Celsius. The powder cutting torch is more expensive than the regular cutting torches because there is an extra fed in the torch which allows aluminium and iron powder to be supplied. This is what increases the temperature of the flame. The plasma cutting is run by supplying electrical energy to gases such as helium and argon. These are used to cut alloyed steel which can be a slow process using the other two methods. Plasma cutting torches can cut up to four time faster than powder cuttinf torches. Explosives Explosives can be used in the demolition of buildings. Explosives can be set of using a wide variety of detonators which allows different detonation speeds. Explosions can be set off immediately or can be delayed by milliseconds if required. By blasting certain components of the building before others, it will allow the collapse of the structure to be carried out in a controlled manner. Even though this may help in accurately collapsing the building, there are still numerous examples of demolitions that have gone wrong when explosives have been used. This is why a large area must be cordoned off around the demolition site before blasting takes place. Crushing Separating CD Waste Immediately after a structure has been demolished it is transported a treatment plant where crushing and separating takes place. This enables new materials to be produced. The CD waste must go through a number of processes before it is recycled. It must get sieved, pre crushed to prevent the lager materials from damaging the main crusher and all material such as steel, glass, plastics and timber must be removed manually, by air separation or by washing. The materials must then be sieved at the end of the process in order to get the requied sizing for the new material. Jaw Crusher The jaw crusher is the machine use to pre-crush the CD waste. Large components such as reinforced concrete can be fed directly into the toggle crusher and are broken down into smaller piece by the moving jaw plate. Jaw Crusher Cone Breaker This type of machine cannot deal with large CD waste. After the waste has been pre-crushed the cone breaker is used as the main crusher. Inside this crushing machine is a cone that moves at high speed crushing waste material against fixed plates. Cone Breaker

Saturday, January 18, 2020

Roots of the Civil War

I believe that the Civil War began with the debate over the future of slavery. That very issue led to secession, and secession caused a war where the Northern states fought for the ground of the Union, and the South for their independence as a new confederation of states under its own constitution. It seems to me that any disagreement leads to some form of resentment. We tend to not like what we don’t understand, and it was hard for the North to understand why the Southern states were itching for freedom from them. It seems from a broader point of view that the North has gone through so much just for the Southern states of America to exist. It only makes sense that Northern leaders would feel angry and betrayed by hearing that those states that they have worked so hard to establish now want their own sense of independence. At the same time however, the South had more of a need for slaves than the north did. The agricultural part of the South employed slaves to tend the large plantations and perform other duties. Slavery was a natural part of the Southern economy even though very few of the population actually owned slaves. Slaves could be rented or traded or sold to pay debts, making them very useful to ranchers. The North didn’t seem to have much use for slaves due to their poor soil; therefor they could not understand why the South was against abolishing slavery. I don’t believe that this war could be avoided due to the issue of slavery. If America didn’t stand against slavery, then the slaves themselves would have eventually done so. As said before, we don’t like what we don’t understand. Fighting with â€Å"each other† as opposed to fighting with who we then knew as â€Å"them† had more hope for success and peace in the end.

Thursday, January 9, 2020

What the Pros Are Saying About Professional Custom Essays and How This impacts You

What the Pros Are Saying About Professional Custom Essays and How This impacts You Today, everyone can rely on professional custom writing service help in various situations. If it's the first time you're likely to use our article writing service, you most likely have plenty of questions. Needless to say, very good work cannot be cheap, but we also attempt to keep pace with our clients' needs and opportunities. At some stage, you will also need to settle on which type of editing to pay. Essay writing services UK are good when they're delivered in time. Our writers be careful to adhere to the greatest standards in custom writing service. Only professional customized assignment writing services can provide a wide selection of areas. Just professional personalized assignment writing services can provide an extensive selection of areas. Use the aid of true academic experts and receive the service you have earned! Our expert is always ready to reply to you as fast as possible with precise info. Our experts understand how to facilitate your educational process by supplying top-notch essay writing services. The standard of an essay can be set by various elements. Welcome to where you get an expert customized essay service provided by top-rated essay writers in the business. Therefore it is critical to figure out about to compose a productive essay. Nowadays it's very hard to locate a trustworthy essay writing service. Our UK custom essay writers have access to the most effective scholarly libraries online and so they can locate the most suitable materials to serve as sources for your paper. Our experienced and trained writers have a huge experience of writing on several kinds of essays. Get in touch with the expert essay writers for any form of writing project you require assistance with. Therefore, don't hesitate to reach out to the group of writers if you need assistance with uk essays or any other sorts of papers. While perfecting or advising on a distinct unfinished work is a facility which is not typically provided by a customized essay writing UK, it's still provided by some of the greatest custom essay writing services on earth. You only have to let us know which form or kind of essay you require assistance in. You'll access low-cost essay writing services instantaneously! Just complete the purchase form online with particulars of the paper that you want to be written. Our writers will thoroughly examine your first instructions to make sure that completed order meets all of your expectations. Proceed to the Order Now page and there you need to complete some personal particulars and the order details. With a simple purchase procedure, it couldn't receive any simpler. What You Should Do to Find Out About Professional Custom Essays Before You're Left Behind Customized essay UK has been at the forefront of supplying essay services for students, not just from the united kingdom, but fr om all around the world for ages. Customers rave about the fantastic values they receive because we take action to offer much more for the price which other businesses that offerprofessional customized essays. Several organizations may also offer health along side other additional advantages. Otherwise, you risk writing a paper that is hard to understand what your principal argument is. The most frequently encountered paper writing service that the majority of our clients require is essay writing. You'll have your assignment done by means of a writer with a degree associated with your topic. At our business, you can get any assignment round-the-clock. For this reason, you might be certain that the paper is the end result of meticulous hard work of several men and women. There won't be a plagiarism problems in the content you get at our site. If you discover that the writer did not provide precisely what you expected, request a revision, and we'll make the corrections. Ou r writers cover several regions of expertise, which means you may rest assured that we'll deliver exceptionally-written content irrespective of your topic. Dissertation writing is just one of the toughest coursework assignments your teacher may offer you. Essays are an essential portion of any college practice.

Wednesday, January 1, 2020

The Intertextuality Relationship Between The Stories Of...

The intertextuality relationship between the stories of, â€Å"Where Are You Going, Where Have You Been†, and â€Å"Young Goodman Brown†. Both share a modern gothic, interpretation that investigates the dark side of the human nature. Each story carries out hidden connotation while together have comparable mayhem galore. Both stories have a well-defined central commotion, articulated in ways where both characters in each story confront a surreal event. Giving more clear understanding of its hidden meaning. Ultimately, I will describe the hidden interpretations in each story and the similar hidden association with both characters encountering the devil. As well unveil the possibility of both characters being in a dream like state. Confronted by the†¦show more content†¦Connie and Young Goodman Brown have different story settings in the way they encounter the â€Å"Devil† but none the less they both face an unhuman type being, who resemble the Devil in such a bizarre way. Without hindsight of what such evil events was to come. Connie description of Arnold Friend, a hunting character personifies the Devil, he goes by the name of Arnold Friend, â€Å"Wearing a wig and brought the stems down behind his ears† (Oates 267). Clearly in the bible we know that the devil is the only one who’s is able to appear in different disguise, for he is the only one who can disguise as anything. Arnold Friend is wearing a wig, which is lopsided giving a hint for possible horns. As stated by journalist Kalpakian, â€Å"So omnipresent are the evil acts and consequences that the character faces† (1). This gives validation of what evil Connie is dealing with. Her description of Arnold Friend wearing some boots that he consistently has to adjust, â€Å"†¦the boots must have been stuffed with something so that he would seem taller† (Oates 270). This can be perhaps of him having hooves. Another thing that makes Arnold Friend, resemble the devil is that he seems to be very familiar with Connie’s life, and family whereabouts. He is Mr. know it all, the devil is known for knowing everything. â€Å"How you find out all that stuff? Connie said†¦ ‘I know everybody’† (Oats 265). His uncanny ability to